The distance from Godrej Lakeside Orchard to Bangalore Airport is 49.3 km via Whitefield - Hoskote Rd, which takes 1 hour and 46 minutes. Alternatively, taking the Varthur-Sarjapur Rd takes 1 hour and 58 minutes by car to cover the 51.2 Km distance to the Airport.
Kempegowda International Airport is the primary serving international airport of Bangalore. It spans over 4,000 acres and is located in Devanahalli, North Bangalore. It was opened in the year May 24, 2008, and has 2 terminals. The airport is about 35 Km away from Devanahalli and serves the entire city. It was named after King Kempegowda I and is a public-private consortium. The airport handles about 37.5 million passengers each year. It is famous for being the first solar-powered airport and is considered one of the most beautiful in the world. Its direction is in the Northern part of the city with pincode 534320. Its address is Bengaluru, Karnataka 560300; IATA code: BLR. To find it on Google Maps, people can use coordinates 13°11′56″N and 077°42′20″E.
Today the KIAB has become world's one of the busiest airports. It welcomes both domestic and international routes and is a major hub for airlines like Indigo, Air India, and Vistara. This airport continues to evolve and play a key role in connecting Bangalore to the world.
KIAB is run by Bangalore International Airport Limited (BIAL). It operates as a public-private partnership, balancing the management. The ownership is divided as follows:
The KIAB houses 2 terminals, T1 and T2, where T1 is for domestic and T2 is for international flights. There are 2 runways in the airport that are primary carriers spread over 4000 m.
Terminal 1 is a large, single terminal for domestic flights, covering 150,556 m². It can handle passengers up to 20 million every year. The terminal has two lounges to provide a comfortable space for travelers, displaying local art and culture. There is also a separate VIP lounge, covering 930 m², for exclusive use.
Since Sept 12, 2023, Terminal 1 handles only domestic flights. The airlines operating from Terminal 1 are IndiGo, Akasa Air, Alliance Air, and SpiceJet. All international flights have been shifted to Terminal 2.
T 2 at KIAB was inaugurated by PM Modi on Nov 11, 2022, and started operations in Jan 2023. It cost around Rs 5,000 crore to build and covers 255,000 sq.m. T2's capacity has increased by 25 million passengers each year. There are also plans for a 2nd phase, which will add another 20 million passengers annually. T2 began handling domestic flights on Jan 15, 2023, and started managing all international flights on Sept 12, 2023.
The Bangalore Airport is the 3rd busiest airport in India and is the 25th in Asia. It ranks in the 56th position as the busiest airport as per the data of 2023-24.
Yes, Bangalore has 2 airports, and its main serving airport is KIAB and, for military purposes, the HAL airport.
Yes, T1 and T2 are located within the same airport campus, about 600 meters apart. The free shuttle bus takes around 10 minutes to travel between the two terminals.
Larsen and Toubro of India handled the civil engineering and construction work, which began in July 2005.
The airport has 22 gates with 95 check-in counters, along with 15 bus gates and 17 security check lanes.
Pre-Launch Date | 01 August 2024 |
Launch Date | 01 October 2024 |
Completion Time | 5 Years |
Possession Date | 31 December 2029 |
Godrej Properties pre launch new project is Godrej Lakeside Orchard
Call | Enquiry |